CASE STUDIES

Deployment experience

Continuous thermal monitoring in service at 500 kV, 110 kV and 22 kV substations and hydropower plants, and exported to three countries.

Explore Technical Details ↓ Request Engineering Consultation

Installations (2022–2026)

SegmentInstallations (2022–2026)
Transmission, 500 kV16 substations: transformer bushings, reactors, autotransformers, disconnectors, bay equipment. Includes a competitively tendered substation with 456 sensors and 12 receivers
Distribution, 110 kV12 substations: primary equipment and MV switchgear
Distribution, 22–24 kV11 substations: MV switchgear, RMUs, LV boards
Power plants4 hydropower plants: transformers, generators, 220–500 kV equipment
ExportCanada (systems integrator), Thailand (220 kV substation), Indonesia (MV switchgear at a pulp and paper mill)

What temperature revealed

Site names are withheld. Visits and reference letters can be arranged with the owner's consent.

⚡ ENGINEERING CONSULTATION & QUOTE

Consult with VTI Grid Monitoring Specialists

Provide your project scope, voltage level, or SCADA requirements. Receive detailed technical proposals, CAD files, and pricing after engineering review.

🛡️ Cloudflare Human Verification * 🔒 Verify below to unlock Submit
Direct Engineering Support
Technical response & quotation turnaround

Full System Lifecycle Support

From pre-sales link budget calculations to remote SCADA commissioning, our engineers support your installation from start to finish.

Global Headquarters & Contact

VIET TECH INVEST (VTI CORP)
Hanoi, Viet Nam
Hotline: +84 985 186 181
Email: [email protected]