GW22-D is the receiver installed in the substation or panel. It collects data from VTI sensors and from other devices in the bay, and delivers it to your SCADA, DCS or BMS — or keeps it on site when there is no network.
Industrial Gateway GW22 DIN-rail mounted in substation auxiliary protection cubicle
| Capability | Description |
|---|---|
| Radio reception | BLE 2.4 GHz and LoRa AS923 at the same time. Receive-only: no commands are sent to sensors |
| Sensors | Up to 1,000 sensors per gateway; gateway count per site is set by the radio survey |
| SCADA connection | IEC 60870-5-104 direct to SCADA, without middleware. Modbus TCP, Modbus RTU, MQTT, REST API. Point lists exported as CSV |
| Ports | Ethernet RJ45; RS-485 in 4, 8 or 16-port configurations |
| Third-party devices | Reads other vendors' devices over Modbus: analysed output of DGA monitors, summary values of PD units (pC, pulse count, alarm), current, voltage, power, vibration |
| Per-bay summary points | Sends per-bay values to SCADA so operators see bays, not hundreds of points |
| Self-registration | The web interface lists sensors in range; select and add them. History, charts and default alarms start immediately |
| Alarms | Threshold, rate of rise, phase-to-phase difference, loss of signal |
| Local storage | 30 days by default, extendable with a memory card. Runs without Internet or a server |
| Power supply | 220 V AC/DC |
| Operating temperature | −40…+85 °C |
Receive official Modbus register address maps, MQTT TLS setup guides, IEC 60870-5-104 profiles, and quotation after engineering review.
Our automation engineers provide remote assistance, wiring schematics, and preconfigured register maps for RTU commissioning.
VIET TECH INVEST (VTI CORP)
Hanoi, Viet Nam
Hotline: +84 985 186 181
Email: [email protected]